Basement Spaces
Basement Playrooms in Lehigh County, Pennsylvania
A playroom is the room that changes the most over ten years, so it is worth building it to be easy to repaint, re-furnish and eventually repurpose.
- Part of
- A finished basement
- Built by
- Our own crew
- Service area
- Lehigh County, PA
Floors that survive the first decade
The slab gets the same treatment as any other finished basement here: moisture check first, then a floated and sealed subfloor assembly so the finished floor is warm underfoot instead of cold concrete. Most families end up on luxury vinyl plank with soft area rugs over it, because it takes spills, wheels and dropped toys without showing the history.
Where a family wants a padded surface for younger children, we plan for it in the framing stage so thresholds at the stairs and the doorways still land flush.
Light, storage and sound
Basements have less daylight than the rest of the house, so lighting does the work. We lay out even, dimmable recessed lighting rather than a few bright fixtures, which keeps the room usable for reading and quiet play as well as noise.
Built-in storage along one wall keeps the floor clear and gives the room a finished edge. Insulating the joist bays above the playroom keeps the noise from carrying into the kitchen and the rooms above.
Safety details we handle as standard
Stairs get a proper handrail and even risers, outlets are tamper-resistant, and the mechanical area is separated behind a door rather than left open to the play space. If the basement will also hold a sleeping room down the line, we talk about egress before framing rather than after.
Built to become something else later
Children outgrow a playroom. We frame and wire it so the same room can become a game room, a home office or a guest space without opening walls again — extra circuits where a future desk or television is likely, and blocking in the walls for mounting.

What it costs
$35,000 – $75,000
Most finished basements in Lehigh County land here. Size, bathroom, finish level.
Plan My Basement- On site
- 6 – 10 weeks
- Permitting first
- 2 – 4 weeks
- Price
- Fixed, in writing
Part of a finished basement
This is one piece of a larger build. See what a finished basement includes, or read how we work.
Ready to talk about your basement?
A walkthrough and a moisture check come before any price.